From Approved Drawing to Installation
For a project budget, confirm the paint finish, desk size and cabinet configuration before comparing quotes. Ask both suppliers to price the same specification, then compare freight and installation separately so the number reflects the finished room rather than a worktop unit price.
Production for steel-frame executive desks with painted panels takes around 25–30 days, excluding shipping and on-site installation. For projects with a fixed opening date, share the destination and required access date so the schedule can be worked backwards and coordinated with the rest of the fit-out.
Send M&W a dimensioned plan with door and window locations, outlet positions, and an equipment list. We can compare desk and cabinet orientations before you approve the order, so changes stay on the drawing rather than on site.
Why M&W? Executive desks, side cabinets, mobile storage, cable trays and desktop cable boxes can be specified from one drawing set, which removes the interface problems that appear when different suppliers own different parts. Paint finish, frame and cabinet configuration are listed in the same quote, so nothing hidden turns up at comparison stage.
Send M&W your floor plan for a configuration review