banner
  1. Home
  2. About Us

ABOUT M&W

  • 95%

    self-made materials

  • 7days

    sample finished time

  • 85 %

    85% of the Japanese market

  • 10

    number of workshops

  • 120000 ㎡

    factory area

  • 40000 seater

    monthly workstation capacity

  • 54 styles

    partition styles

  • 202

    number of patents

  • 200 designs

    Choice of space solutions

  • within 24 h

    complete overall view photo and quotation

  • 600 people

    factory employees

  • within 20 days

    thousands of seaters project

About Our Factory

We are a comprehensive productivity factory, designated supplier for over 50 companies from World's Top 500, with 120,000 ㎡, 600 people, 10 workshops, 500 machines, and 6S workshop management, producing 40,000 seaters and office desks per month with 95% self-made materials.

ed0a8530b907dcf0aa4ec9d64a6251ea
dc0cc65ae30b187111def7d5f7468dff
2b9239022208dd512eba4ff515e91c2e
67d6df813146e50f4b564695efdf2af8
b5d84c2f752fe2468cbf00b0e5c36bb9
0b712679d34e11a575dff57df7c9c6cd
da01cd6eb65a3439b2a9f65479ca22ab
056ef4b31de44577392da71c929410de
6141a822246e51aa487b2e7a5639a44b

Aluminum extrusion workshop

The aluminum extrusion workshop has a total area of 10,000 ㎡ and 50 technicians, adopting the 6S workshop management mode. The workshop has one 1500T extruder, one 1000T extruder, three 600T extruders, and one aging furnace working together. Aluminum extrusion and aluminum aging treatment take 4 days. The monthly production capacity reaches 1200 tons, and the one-time pass rate reaches 99%.

4097887cc72c9d8dd44bdb72d21c057d
cb118a5e2404bc6b25760ca7a2d20e06
f76877fa784df6ec7bbea92e2b61165a
ee3073db9359e006ec39a697694f0263
60124db8999e5c6d075b84c5f1417fb6
0f83aa11e18b32c3f3043c16e8c5a3bc
2c3da1a1b521753b34e2a1167575469f
e4803703da5e9b929f44a0ad12f013a1
39a3753f2c639551a5daac6507e2e776
6815854e593ca2ec56d1a597aa761f37
f8d92a659b2aeb368060a8dff58cb7fd
f226d0ab6b1460cba0bf01af1689d575

Partition workshop

The partition workshop covers a total area of 5,000㎡, with 55 technicians and 20 pieces of professional equipment, adopting the 6S workshop management mode. It takes 4 days from the board cutting, board connecting, plate drilling, fabric covering, and assembly to the final packaging. The one-time pass rate of products reaches 99%. The monthly production capacity reaches 25000㎡.

cfb7cd442d3c17a4005693dcfbe4b196
176c6c0154d49de171d44bae255278a5
09d5cadbd9e02ba38d6258a2c64118ed
74b14859d3218fa7a63f12078ab8744d
6aa97ef77fc83cc9703e78a438ac73e5
f3ffe16b7a9637d39035b4942b5f01d4
fec286ad16eb57f2cbe6c6b37c42d3c5
5f7ed968950479be4c6e6bff29cbf0b7
ec676948f5e653d14334fa6ff874317d
1bdeb393595c014bb8cdf2b76470b2d5
3507f4ecac36671ad49d788e08953aee
818e84c1afd53698befbb7c62b17e16a

Melamine board workshop

The melamine board workshop has a total area of 9,000 ㎡, 55 technicians, and 28 pieces of professional equipment, adopting the 6S workshop management mode. It takes 4 days from the board cutting, edge banding, plate drilling, and installation to the final packaging. The one-time pass rate of the product reaches 99%. The monthly production capacity reaches 1 million dollars.

34e09b3b097cdca1d01aeb1f4d82634f
fc35a8c42b261070e31ffd16b0b3cead
a113dac3fbdb0f938c547733bdf570d3
903ffd234baa5f01aa1915c616a0dfe3
bb2256ea3e80abb9e3a89496b60904a8
101e9cfdd22c8c345fb0e1b3d9a264fa
dc548bf7cf5a78d0babf6cd1bffe2b7f
5e011dbd77c103e194cbe62ee46273b9

Anodized aluminum workshop

The anodized aluminum workshop covers a total area of 2,000 ㎡, with 40 technicians and a production line worth 5 million yuan, adopting the 6S workshop management mode. It takes 4 days from cleaning and oxidation to final packaging. The one-time pass rate of products reaches 99%. The monthly production capacity reaches 1,000 tons.

1f20892fb2b4ba6d6612d2a49623888c
fd13f52e8b47ba7c891f9ceeb5ad96b8
19e5a4d5a7f1eaadf8c85a0d48f125ca
66aa3d2ca97fb4a44c9d01881a1b98be
303c18f81aa686274a8e1b20f17d0b55
b91e85303e732e2460e7392150114466
5ac446d2131b60952a3efd8e70a78d14
1b85fad5c444f29570035c1643516897

Metal workshop

The metal workshop has a total area of 11,000 ㎡, with 120 technicians and 120 pieces of professional equipment, adopting the 6S workshop management mode. It takes 7 days from iron sheet cutting, laser cutting, bending, punching, welding, polishing, and powder coating to final packaging. The one-time pass rate of products reaches 99%. The monthly production of 10,000 steel cabinets and 8,000 desk frames reaches 2 million dollars.

00ce31aac37c5208a267627473e3832e
354702f098a96c0d2cdf0d60b2a7d48d
b07dd1c03ccf60d928e9677a3719dd5e
1bc0aae9ea0f0a3dbded27c5d4e98a72
11a64a68c5c20d8aaaaa1d8bf8e586ca
f16d7fec699796c3c2528792caac35e4
02f8534cd5161c4f01da1bb2361d3ecf
9804c044fdad75955dda402d45d620d4
369f7738a1196f89b7dc926f9bc23ebd
301eba8aceb737354b4d689df724149b
ae9f5475b051e03af6c52726129b8adf
7e1bdd1a42892136ed808458f96f13eb

Plactic Injection Workshop

The plastic injection workshop has a total area of 1,100 ㎡ and 20 technicians, adopting the 6S workshop management mode. The workshop has one 380T, one 180T, one 160T, and three 120T injection molding equipment working together at the same time. It takes two days from plastic injection and installation to final packaging. The one-time pass rate of products reaches 99%. The daily capacity reaches 12,000 turn-ons.

4821239bf7896261ad9b0d1fc35a5ecd
5cf70ff811077cba6ed1583c69cd5b70
9245a5afb8a44fdde19d525c037b0f8b
a2e17af4f675fd699f6273055bae9786
229cff12e306032a9dbe703eb268baf2
cdff5d6a4e67942e8d968de8398f8430
50b025aaa0bda5196b4fb8ab7b9abdf2
34cd6c40ce800ced40fd9cbcd461e134

Die-casting workshop

The die-casting workshop has a total area of 500 ㎡ and 5 technicians, adopting the 6S workshop management mode. The workshop has three zinc alloy die-casting equipment and one die-casting aluminum equipment working at the same time. It takes two days from die-casting, and installation to final packaging. The one-time pass rate of products reaches 99%. The daily capacity reaches 8000 turn-ons.

5fee1c729d4386d0496b0964e4fccf5d
2d8dc2064df3d36011e238cae088d288
30a855a5147bc5ee1522217d1536e864
0f10425da443e5ed9e89933b1e08f8a7
c09f636d1fc06a57034d15f31b1a9729
46ee7f029b5d9d0cc6a9e6b781fbf898
fbd8b6fc715c15075be7c50b500b588d
457fd46c19995af983c1d9546276bf47
b69ba554ca5a7a3bd5d7e7537462db78
eed02be7ae62e23fb4ff620d040bfb6a

Powder coating Workshop

The powder coating workshop covers a total area of 2,000 ㎡, with 30 technicians and 2 powder coating production lines worth 10 million yuan, adopting the 6S digital lean production mode. It takes 4 days from cleaning, powder coating, and curing to final packaging. The one-time pass rate of products reaches 98%. The monthly production capacity reaches 1,200 tons.

e51eba496d9d99ef87aa754930293b81
2340b4167df932ee56a3af3ba91719c0
00a375484f91a50c2d848d419c97c191
8d05f95b374c77cdb478226a5e1bc956
4e571d53f072c084db4dc32d447d400c
883311436eb13145e436c8d568bc0b94
e05f143b4051ce728fef02bd0c4e8640
a03eb6f70637d9e1da86706a0559ebc2
c16e79f02534b2e1daf9887b986948c2
3ca77b9949ec2cbcd54b1db1265ff077
e0f350fe677a30fdae0ff7d546ffc31a
1426f3982f7840731e376737e05948ff

Mould workshop

The mould workshop covers a total area of 300 ㎡, with 12 technicians and 30 pieces of professional equipment, adopting the 6S workshop management mode. It takes 20 days from lathe processing, milling, drilling, heat treatment, grinding, wire cutting, and assembly to the final mold test. The one-time pass rate reached 80%, and the monthly production capacity reached 200 sets of molds, which ensured the compatibility of all accessories and reduced the product development cycle by 2/3.

b27c04cdbc0d12056cbe78d01479b786
ba347278338cb417052608985cb6e518
db2219ffed783c8bab8e0bd77bb578dc
bb4bc9d6b23561f3bd2df81a398b185a
bf8f96ff8d053549094a16f6fd9519a4
7b0f937fa3de6821904458b733db9920
23edd90dc0a96af208c99bfe5351599e
db226468b0bae6a278de9e93b10f466b
8611463cf0905e8ff380decdc24557b0
4e12a8da81a84ebe86853b8a9bfacdad

Laboratory

The laboratory covers a total area of 200㎡, with 5 technicians and 20 pieces of professional equipment, adopting 6S on-site management. It is mainly responsible for physical property testing of boards, salt spray testing, product function testing, carton strength testing, product tension testing, formaldehyde release testing, and spraying adhesion testing. Sampling testing is conducted for each batch of products. Every three days is a testing cycle, and the one-time qualification rate reaches 98%.

Our Certificates

Cooperative Partner

See what our partner are saying about us

We are one of the biggest office furniture manufacturers in China, with ISO9001 quality management system certificate; Environmental Management System Certificate ISO14001; Occupational Health Management System Certificate OHS18001 and the preferred manufacturer for large bidding projects at home and abroad.

  • partner-logo1
  • partner-logo2
  • partner-logo3
  • partner-logo4
  • partner-logo5
  • partner-logo6
  • partner-logo7
  • partner-logo8
  • partner-logo9
  • partner-logo10
  • partner-logo11
  • partner-logo12

Brand Story

On June9, 1990, the factory opened, with 2 employees, specializing in the production and processing of molds.

 

In 1992, the factory was relocated, with 16 employees, mainly engaged in mold processing and engraving.

history-1-bg

In 1993, the factory was relocated, and a number of mold design and mold manufacturing personal were recruited, and the number of employees increased to more than 40.

 

In 1996, with its own mold development and production technology advantages, the company invested funds to develop the first office screen, which is also the first office screen in China. Since then, M&W has emerged as a manufacturer of office furnitures and plastic hardware.

history-2-bg

In 2003, the number of employees increased to more than 500, and the company transformed into: specializing in the production and sales of office furniture and accessories.

 

In 2004, the factory was relocated, the number of employees more than 600 people, the company put forward a new business philosophy: to become the best office furniture supplier in China. In August of the same year, the company's quality department was officially established.

history-3-bg

In 2005, the factory was relocated, and the quality department strictly followed up the product quality, and achieved remarkable resuits.

 

In 2007, it passed the certification of Guangdong Province using international standard products and enviromental management system SO14001.

history-4-bg

In 2013, we provided 600,000 sets of workstations to global sales, and in March of the same year, we won the Gold Medal for Manufacturing Technology and the Gold Medal for Booth Design at the 31st International Furniture Fair.

 

In 2015, it gradually expanded from the traditional hardware manufacturing field(network communication cabinets, chassis, electronic power supplu peripheral hardware accessories, auto parts development and production, development and profuction of various hardware molds). Tax payment exceeded 10 million.

history-5-bg

In 2016, the company introfuced a number of advanced machines, and passed the measurement management system certification, and won the title of national high-tech enterprise.

 

In 2018, the company set up the project of engineering technology research center, and we continue to move forward!

history-6-bg