EN

M&W Workshops:Exploring Our Production Facility

2023-05-26

 

We are a comprehensive productivity factory, designated supplier for over 50 companies from World's

Top 500, with 120,000 ㎡, 600 people, 10 workshops, 500 machines, and 6S workshop management,

producing 40,000 seaters and office desks per month with 95% self-made materials.

 

 

 

 

 

                                                                                    Aluminum extrusion workshop

 

 

 

The aluminum extrusion workshop has a total area of 10,000 ㎡ and 50 technicians, adopting the 6S

workshop management mode. The workshop has one 1500T extruder, one 1000T extruder, three

600T extruders, and one aging furnace working together. Aluminum extrusion and aluminum aging

treatment take 4 days. The monthly production capacity reaches 1200 tons, and the one-time pass

rate reaches 99%.

 

 

 

                     Partition workshop

 

 

 

The partition workshop covers a total area of 5,000㎡, with 55 technicians and 20 pieces of professional

equipment, adopting the 6S workshop management mode. It takes 4 days from the board cutting, board

connecting, plate drilling, fabric covering, and assembly to the final packaging. The one-time pass rate

of products reaches 99%. The monthly production capacity reaches 25000㎡.

 

 

 

                 Melamine board workshop

 

 

 

The melamine board workshop has a total area of 9,000 ㎡, 55 technicians, and 28 pieces of professional

equipment, adopting the 6S workshop management mode. It takes 4 days from the board cutting, edge

banding, plate drilling, and installation to the final packaging. The one-time pass rate of the product

reaches 99%. The monthly production capacity reaches 1 million dollars.

 

 

 

             Anodized aluminum workshop

 

 

 

The anodized aluminum workshop covers a total area of 2,000 ㎡, with 40 technicians and a production

line worth 5 million yuan, adopting the 6S workshop management mode. It takes 4 days from cleaning

and oxidation to final packaging. The one-time pass rate of products reaches 99%. The monthly

production capacity reaches 1,000 tons.

 

 

 

                        Metal workshop

 

 

 

The metal workshop has a total area of 11,000 ㎡, with 120 technicians and 120 pieces of professional

equipment, adopting the 6S workshop management mode. It takes 7 days from iron sheet cutting,

laser cutting, bending, punching, welding, polishing, and powder coating to final packaging. The one-time

pass rate of products reaches 99%. The monthly production of 10,000 steel cabinets and 8,000 desk

frames reaches 2 million dollars.

 

 

 

               Plactic Injection Workshop

 

 

 

The plastic injection workshop has a total area of 1,100 ㎡ and 20 technicians, adopting the 6S

workshop management mode. The workshop has one 380T, one 180T, one 160T, and three 120T

injection molding equipment working together at the same time. It takes two days from plastic

injection and installation to final packaging. The one-time pass rate of products reaches 99%. The

daily capacity reaches 12,000 turn-ons.

 

 

 

                   Die-casting workshop

 

 

 

The die-casting workshop has a total area of 500 ㎡ and 5 technicians, adopting the 6S workshop

management mode. The workshop has three zinc alloy die-casting equipment and one die-casting

aluminum equipment working at the same time. It takes two days from die-casting, and installation

to final packaging. The one-time pass rate of products reaches 99%.  The daily capacity reaches

8000 turn-ons.

 

 

 

                 Powder coating Workshop

 

 

 

The powder coating workshop covers a total area of 2,000 ㎡, with 30 technicians and 2 powder

coating production lines worth 10 million yuan, adopting the 6S digital lean production mode. It

takes 4 days from cleaning, powder coating, and curing to final packaging. The one-time pass

rate of products reaches 98%. The monthly production capacity reaches 1,200 tons.

 

 

 

                        Mould workshop

 

 

 

The mould workshop covers a total area of 300 ㎡, with 12 technicians and 30 pieces of professional

equipment, adopting the 6S workshop management mode. It takes 20 days from lathe processing,

milling, drilling, heat treatment, grinding, wire cutting, and assembly to the final mold test. The

one-time pass rate reached 80%, and the monthly production capacity reached 200 sets of molds,

which ensured the compatibility of all accessories and reduced the product development cycle by 2/3.